IPO 500v2 failover question 1

Status
Not open for further replies.

gshaheen

Vendor
Apr 22, 2001
107
US
In an environment with 2 IPO 500v2s connected by SCN…

Site A has 50 IP phones
Site B has 10 IP phones

If the IP phones at site A failover to site B, do I need to have 60 end point licenses at site B in order to have all 60 phones work?

Thanks.
 
no, backup IPO will operate for 30 days without any additional licenses in an SCN environment
 
no, backup IPO will operate for 30 days without any additional licenses in an SCN environment" - or after reboot
 
1 more related question, in the event of a system outage in system A, will the hunt groups in system A get copied to system B, or do I have to pre-program them in system B in the event of an outage in system A? Thanks again.
 
@VinylDave - No, if the backup system is rebooted it will no longer support the phones that have failed over to it.

Also, failover system needs sufficient VCM channel to cope with suddenly supporting 5 times as many IP phones.

Stuck in a never ending cycle of file copying.
 