I have a customer upgrading/installing to all 7 sites.
They are looking for documention on how a "Wagon Wheel" SCN works. That being if center IPO goes down how the SCN channels are affected as the call traverses over multiple IPO's. If the call starts at IPO-A and needs to go to IPO-D will it use the SCN licenses in B and C while the call is active?
I'm implementing a thorough Mesh (SCN to every location on every IPO)but would REALLY like to see the above in documentation, if my statement is even true
Thanks.
They are looking for documention on how a "Wagon Wheel" SCN works. That being if center IPO goes down how the SCN channels are affected as the call traverses over multiple IPO's. If the call starts at IPO-A and needs to go to IPO-D will it use the SCN licenses in B and C while the call is active?
I'm implementing a thorough Mesh (SCN to every location on every IPO)but would REALLY like to see the above in documentation, if my statement is even true
Thanks.