I have a BCM450 rel 1. I am going to install an expansion cabinet along with a needed MBM. I have all the needed equip along with the Key Code to enable the port. My question is....May I install the expansion, data cable between. Also I will need to configure the MBM prior to installing the MBM and powering it up...
What I need to know is can I leave power on the main cabinet, do the config, install the MBM and then power up the expansion?...Or do I need to remove power from the Main before installing the 256 cable?
Thanks so much...Kurt68
What I need to know is can I leave power on the main cabinet, do the config, install the MBM and then power up the expansion?...Or do I need to remove power from the Main before installing the 256 cable?
Thanks so much...Kurt68