Hello. Perhaps someone can help me with this scheduling requirement.
I have one report that I want to use as a "trigger" to kick off the generation of several other reports. Let's call this one report "checkForData".
I want to do the following:
- Run checkForData at 3:30am. If it succeeds, it will send an event which several other reports (that have already been shceduled) are waiting for. If it fails, I would like this report to rerun 10 minutes later.
I was hoping the "Number of retries allowed", and "Retry interval in seconds" options would allow me to do this, but it is not working at all.
Instead, the report fails, and it is not rerun again.
thanks,
dan
I have one report that I want to use as a "trigger" to kick off the generation of several other reports. Let's call this one report "checkForData".
I want to do the following:
- Run checkForData at 3:30am. If it succeeds, it will send an event which several other reports (that have already been shceduled) are waiting for. If it fails, I would like this report to rerun 10 minutes later.
I was hoping the "Number of retries allowed", and "Retry interval in seconds" options would allow me to do this, but it is not working at all.
Instead, the report fails, and it is not rerun again.
thanks,
dan