Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations strongm on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

uprgade SP in TSW 2

Status
Not open for further replies.

teretore

Technical User
Sep 2, 2009
18
EE
Hi,

I have doubbt about upgrade´ng SP in TSW.
If I have many LIM´s all over city and difficulty restarts
all of them in same time.
Can I do upgrade in such a scenario:
Preparing new CF disk with new SP and all configuration,
disconnecting NIU2, (without un-mounting etc)
replacing CF,
conneng NIU2,
send command :LALRL:LIM=all;
It should reload all new units and conf from disk to all LIM-s.
Is it doable this way?

In TSE it is much easyer :)

/BR

 
Hi,

this should work, if I were you, I would do the proper unmount/mount procedure (without FICRI offcourse)
This to minimize the chance corrupting the file system...

/Daddy

-----------------------------------------------------
Helping people is my job...
 
teretore,

I assume you have a simulator/lab or equal? If yes, Daddy is right, if not, how are you going to transfer the data?
 

Thanks,
yep, question was "is it possible" or need
go on-site in each LIM. Now I will tray without visiting all LIMs.
with unmounting/mouting procedure in NIU2 :)

And data-backup - I can create lab or order Easy SW Upgrade from Aastra, basicly same result.

Thanks agen
 
Teretore,

2 things :
- I don't know which SP you are trying to load but be aware that PROM upgrades may be needed (LSU/DSU/LPU) so maybe you have to go on site anyway...
- just make sure that the PCM links are stable (i.e. no alarms) before issuing the LARL command


/Daddy

-----------------------------------------------------
Helping people is my job...
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top