hey Guys,
we want to upgrade a site which is also in a SCN environment. They have three sites with 2 IPO 406v2 and 1 small office. The 406v2 both have enough memory so that shouldn't be a problem. Currently they run 3.2.55 on al IPO's. The main site also runs Voicemail Pro (centralized voicemail) version 3.2.30. We want to upgrade the two sup-locations first to 4.2.x. Is this the best way? Do we need to upgrade voicemail pro first?
Thanks!
we want to upgrade a site which is also in a SCN environment. They have three sites with 2 IPO 406v2 and 1 small office. The 406v2 both have enough memory so that shouldn't be a problem. Currently they run 3.2.55 on al IPO's. The main site also runs Voicemail Pro (centralized voicemail) version 3.2.30. We want to upgrade the two sup-locations first to 4.2.x. Is this the best way? Do we need to upgrade voicemail pro first?
Thanks!