DoubleDizzle
Programmer
I have a NEC SV9100 system out there that is running on software version 1.08.08. (I know, that's crazy old).
I've been tasked with upgrading the system to at least 12.00.5 or higher.
I've never upgraded one that old and not sure if it can handle a big version hop or if it should be done in incremental steps.
Has anyone out there attempted a huge version jump like this before?
Thank you for your input.
DoubleDizzle
I've been tasked with upgrading the system to at least 12.00.5 or higher.
I've never upgraded one that old and not sure if it can handle a big version hop or if it should be done in incremental steps.
Has anyone out there attempted a huge version jump like this before?
Thank you for your input.
DoubleDizzle