HI I HAVE THIS ISSUE.
I HAVE A COVERAGE PATH ON STATION 7000 WITH JUST POINT ONE TO COVER AFTER 3 RINGS. THE PROBLEM IS: IF I CALL STATION 7000 IT DOESNT RING, JUST GOES TO THE POINT INDICATED IN THE COVERAGE PATH AS IF STATION 7000 WAS FORWARDED TO IT.
ANY IDEA?
REGARDS.
I HAVE A COVERAGE PATH ON STATION 7000 WITH JUST POINT ONE TO COVER AFTER 3 RINGS. THE PROBLEM IS: IF I CALL STATION 7000 IT DOESNT RING, JUST GOES TO THE POINT INDICATED IN THE COVERAGE PATH AS IF STATION 7000 WAS FORWARDED TO IT.
ANY IDEA?
REGARDS.