Hi
can anybody advise me please or if they have done the following situation. We have a customer to whom we are upgrading 10 lsp over a 6 week period and are planning to upgrade the lsp first and then the main 8720 controllers version 3.1.4 later. Is it possible to install the new s8300d with version 5.2.1 and then take a back up of the s8300B at version 3.1.4 and load these into the s8300d so the translations are then loaded into the 5.2.1 and then we can use the s8300D as a lsp but the the old translations from the 3.1.4 load into the 5.2.1. for the 6 week period and also will the dadmin account be effected by doing this. Hope this make sense
thanks
Daryl
can anybody advise me please or if they have done the following situation. We have a customer to whom we are upgrading 10 lsp over a 6 week period and are planning to upgrade the lsp first and then the main 8720 controllers version 3.1.4 later. Is it possible to install the new s8300d with version 5.2.1 and then take a back up of the s8300B at version 3.1.4 and load these into the s8300d so the translations are then loaded into the 5.2.1 and then we can use the s8300D as a lsp but the the old translations from the 3.1.4 load into the 5.2.1. for the 6 week period and also will the dadmin account be effected by doing this. Hope this make sense
thanks
Daryl