Howdy all.
I'm currently running a RedHat 9 server on a Dell Workstation 400 (Dell mobo, dual P2 300Mhz, 512 meg ram, 80 gig & 20 gig hds, Matrox Millennium(non AGP), on board & 1 pci nic). I have a machine I built last year (ABIT TH7-Raid mobo(not going to use the raid at this time), P4 1.7 Ghz, 1.25 Gig ram, no hard drives, TNT 2 AGP, 1 pci nic) that I want to move the server to.
What I would like to do, if possible, is just move the hard drives and the 1 nic from the old to new machine.
My question -- Will RH handle that? If not, how much work will be entailed? What pitfalls can I look forward to?
Zyxian
I Learn More When Something Goes Wrong.
I'm currently running a RedHat 9 server on a Dell Workstation 400 (Dell mobo, dual P2 300Mhz, 512 meg ram, 80 gig & 20 gig hds, Matrox Millennium(non AGP), on board & 1 pci nic). I have a machine I built last year (ABIT TH7-Raid mobo(not going to use the raid at this time), P4 1.7 Ghz, 1.25 Gig ram, no hard drives, TNT 2 AGP, 1 pci nic) that I want to move the server to.
What I would like to do, if possible, is just move the hard drives and the 1 nic from the old to new machine.
My question -- Will RH handle that? If not, how much work will be entailed? What pitfalls can I look forward to?
Zyxian
I Learn More When Something Goes Wrong.