We are decommissioning a CS1000 (Option 81) that currently has an IBM COTs Signaling Server and MC32s on 7.5. We want to move that Signaling Server/MC32s to another site running 7.5 and install it as a follower for redundancy.
Will the relocated signaling server be a follower of the existing leader in the same node or will it have a new node assigned to it?
How will I address S1 and S2 in the IP phones?
Will the relocated signaling server be a follower of the existing leader in the same node or will it have a new node assigned to it?
How will I address S1 and S2 in the IP phones?