kohlbacher
Technical User
Hi Folks,
maybe I`m to blind to find a solution - maybe there IS no solution to my question - could someone please point me in the right direction ?
Arcserve 2000 - W2K Advanced Server - SAN Option - Compaq TL891 Library:
I`m trying to configure following: Building 5 Groups with 5 Tapes in each group - Full Backup on a weekly basis - trying to configure Arcserve scheduling in that way, that each group uses one week (Customers wish..) so that its possible to remove on week from the tape set ...
So far - so good ... all I found out that if i want to realize that, I have to build 20 Jobs, each running on one or two tapes because it`s IMPOSSIBLE (??) to configure Arcserve 2000 for this situation - any Ideas ???
TIA
Peter
maybe I`m to blind to find a solution - maybe there IS no solution to my question - could someone please point me in the right direction ?
Arcserve 2000 - W2K Advanced Server - SAN Option - Compaq TL891 Library:
I`m trying to configure following: Building 5 Groups with 5 Tapes in each group - Full Backup on a weekly basis - trying to configure Arcserve scheduling in that way, that each group uses one week (Customers wish..) so that its possible to remove on week from the tape set ...
So far - so good ... all I found out that if i want to realize that, I have to build 20 Jobs, each running on one or two tapes because it`s IMPOSSIBLE (??) to configure Arcserve 2000 for this situation - any Ideas ???
TIA
Peter