I have a report (CR 10, running on CE 10 ePortfolio) that uses DataDate to generate page headings (e.g. "as of Jan 07") and to select the current month's data from the database. Unfortunately, a database problem was found, so I have to rerun the report as of November 06 and December 06.
Is there a way to override DataData so that the report will think it's Nov 30 or whatever? It's been a while since I've been working in CR, but I seem to recall that it's possible.
Otherwise my only other thought is to create a hard-coded version to force the dates I want. (Not a long-term solution, but I've need to get these rerun right away)
Any suggestions / advice out there?
thanks!
Is there a way to override DataData so that the report will think it's Nov 30 or whatever? It's been a while since I've been working in CR, but I seem to recall that it's possible.
Otherwise my only other thought is to create a hard-coded version to force the dates I want. (Not a long-term solution, but I've need to get these rerun right away)
Any suggestions / advice out there?
thanks!