thread940-1772508
I have seen responses on the thread above refer to the mtbf calculator on the Avaya knowledgebase. I tried this solution but it does not give me an option to add a server. I need a reference document or a link where I can calculate or get this information. I have seen advises on this forum where a general expected time of operation is given, this will not assist me, I need to be able to produce evidence of the information to a client of mine.
Thanks and Regards
I have seen responses on the thread above refer to the mtbf calculator on the Avaya knowledgebase. I tried this solution but it does not give me an option to add a server. I need a reference document or a link where I can calculate or get this information. I have seen advises on this forum where a general expected time of operation is given, this will not assist me, I need to be able to produce evidence of the information to a client of mine.
Thanks and Regards