Hey folks,
Has anyone out there tackled migrating from a "standard" 3300 to the MCD/MXe Server platform? I'm looking at doing that in a couple of months, wondering what kind of headaches I'm in for.
Here's the layout: currently I have 6 ICP's handling my main site, acting in 3 resilient pairs. Trunking, VM, all of that is handled elsewhere, these are only hosting IP sets. Ideally, I'd love to be able to just backup the database on ICP #1, load it into the MCD box, and have my first phase done. The existing ICP's are all LX chassis (512Mb variety). Is this even possible or are the databases not compatible across the platforms?
Has anyone out there tackled migrating from a "standard" 3300 to the MCD/MXe Server platform? I'm looking at doing that in a couple of months, wondering what kind of headaches I'm in for.
Here's the layout: currently I have 6 ICP's handling my main site, acting in 3 resilient pairs. Trunking, VM, all of that is handled elsewhere, these are only hosting IP sets. Ideally, I'd love to be able to just backup the database on ICP #1, load it into the MCD box, and have my first phase done. The existing ICP's are all LX chassis (512Mb variety). Is this even possible or are the databases not compatible across the platforms?