Hi Mr.Dgillz,
I used Master Schedule report By Details. Sorry for the short report, so I made it was not clearly!
As attachment report: I have 9 Order Entry (Customer Order)with due date from 22.Dec.2009 to 14.Dec.2010 with the same qty - 6912 pcs; When I run merge (Master Scheduling/Trx/ Master Schedule/ Merge...) with all option has been checked; and print the Master Schedule report, I see all OE show on report (COO 909/ COO 1131/...) showed correctly with Due date. But with CPs is only calculate up to Jun.2010
1/ CP 132 3,812 06/01/2010
2/ CP 133 6,912 17/02/2010
3/ CP 134 6,912 27/02/2010
4/ CP 135 6,912 14/04/2010
5/ CP 136 6,912 01/06/2010
6/ CP 137 6,912 01/05/2010
7/ CP 138 6,912 01/04/2010
8/ CP 139 6,912 02/03/2010
================
COO:
1/ COO 909 6,912 17/02/2010
2/ COO 909 6,912 14/04/2010
3/ COO 1131 6,912 22/12/2009
4/ COO 1144 6,912 06/01/2010
5/ COO 1154 6,912 27/02/2010
6/ COO 1154 6,912 21/07/2010
7/ COO 1154 6,912 07/09/2010
8/ COO 1154 6,912 02/11/2010
9/ COO 1154 6,912 14/12/2010
So, I want to talk with CP line 6 -> 8 and compare with COO line 7 -> 9. Seem that so strange; as I know It's must be in Aug.2010 to Nov.2010.
My English is not enough so, I have made report that look not good, too.
Thank you for you help!