MarkSweetland
MIS
Using CR 8.0 and VB6 I have a Line Chart that shows
monthly projected expenditures, current funds
availability, and current expenditures. What I need
to do is stop the lines of the Current Expenditures and
Current Funding at the current date and then continue
the projected line out two months.
I can do this in Excel by inserting a NULL in the
monthly values past the current period for the
expenditures and funds (which is the method in use)
and the line stops. But when I try to do it in Crystal
the and the line shoot to zero. I've tried unselecting
the Report Options; Convert NULL Field value to Default
but the line still is converted to 0.
Any Ideas ?
Mark
monthly projected expenditures, current funds
availability, and current expenditures. What I need
to do is stop the lines of the Current Expenditures and
Current Funding at the current date and then continue
the projected line out two months.
I can do this in Excel by inserting a NULL in the
monthly values past the current period for the
expenditures and funds (which is the method in use)
and the line stops. But when I try to do it in Crystal
the and the line shoot to zero. I've tried unselecting
the Report Options; Convert NULL Field value to Default
but the line still is converted to 0.
Any Ideas ?
Mark