I have a Project 2010 Master project that contains two (2) Subprojects.
What is the best method to hide the Subprojects from both the Gantt and Task Sheet view of the Master project ?
I have tried at some Custom filtering however cannot find a method to filter the out.
KMD
Canada
What is the best method to hide the Subprojects from both the Gantt and Task Sheet view of the Master project ?
I have tried at some Custom filtering however cannot find a method to filter the out.
KMD
Canada