Hey guys i need some help if got two text boxes 1 is Start Date second is Finish date.
Is there a calculation so i can have appear in another text box the duration of the project(time between start and finish) or is this not quite possible
For some reason i am drawing blanks so any help is really appreciated
Is there a calculation so i can have appear in another text box the duration of the project(time between start and finish) or is this not quite possible
For some reason i am drawing blanks so any help is really appreciated