Hey guys,
The guy who programmed the system a long time ago of 2 network merlin systems created a "Pool 70" for the telephone company trunk lines to connect to. The "pool 70" is mirrored on both ends, one with ext. 500-532 and the other 600-632. We are cutting off the telephone co. trunk lines at one end.
I'm I able to just assign the "pool 70" of one end(Side B) to the trunk line already assigned to "pool 70"(Side A) over the tie trunk. Or should I release the 600-632 extensions from Side B "Pool 70" and add them to the "pool 70" on side A over the tie trunk.
I am a newbie so having a lot of trouble, can't even figure out how to use SPM for programming. The software is connected to the Merlin box admin port but not giving any options for system programming.
Thanks in advance for any help. I have a functional diagram if that helps.
The guy who programmed the system a long time ago of 2 network merlin systems created a "Pool 70" for the telephone company trunk lines to connect to. The "pool 70" is mirrored on both ends, one with ext. 500-532 and the other 600-632. We are cutting off the telephone co. trunk lines at one end.
I'm I able to just assign the "pool 70" of one end(Side B) to the trunk line already assigned to "pool 70"(Side A) over the tie trunk. Or should I release the 600-632 extensions from Side B "Pool 70" and add them to the "pool 70" on side A over the tie trunk.
I am a newbie so having a lot of trouble, can't even figure out how to use SPM for programming. The software is connected to the Merlin box admin port but not giving any options for system programming.
Thanks in advance for any help. I have a functional diagram if that helps.