We have upgraded from CM2.2 to CM5.2 with a few problems, but I am wanting to take a G650 stack that was attached Center Stage only and later IPSI's were added and remove the center stage connection....With the IPSI's in place can I just remove the Fiber link to that stack? Will it be service affecting?