PowerChuter
MIS
Can anyone tell me why Backup Exec from Veritas causes Powerchute from APC to think the UPS is on battery and tell the server to shutdown. I have stopped the Powerchute service for now but I'd like to get the two running together. I think it may be an IRQ problem but I can't see a conflict in device manager.<br>
<br>
Thanks<br>
<br>
Andeeeeee
<br>
Thanks<br>
<br>
Andeeeeee