APCs PowerChute and Veritas Backup Exec

Status
Not open for further replies.
Oct 21, 1999
1
0
0
GB
Visit site
Can anyone tell me why Backup Exec from Veritas causes Powerchute from APC to think the UPS is on battery and tell the server to shutdown. I have stopped the Powerchute service for now but I'd like to get the two running together. I think it may be an IRQ problem but I can't see a conflict in device manager.<br>

<br>

Thanks<br>

<br>

Andeeeeee
 
I have experienced a similar problem to this, The Bios assigned a different IRQ than the OS, Changing the OS IRQ setting cleared the fault.
 