Jan 1, 2003 #1 ManojOK MIS Jan 1, 2003 5 SG Is it possible to increase the activity monitor logs to be retained. Please note this is a W2K Master server. Thanks
Is it possible to increase the activity monitor logs to be retained. Please note this is a W2K Master server. Thanks
Jan 2, 2003 #2 jjjon Technical User Jul 31, 2002 165 IE It is. Create a file job.conf in \veritas\netbackup\db\jobs and in this file type keep_days n where n is the number of days Jon... Upvote 0 Downvote
It is. Create a file job.conf in \veritas\netbackup\db\jobs and in this file type keep_days n where n is the number of days Jon...
Jan 2, 2003 Thread starter #3 ManojOK MIS Jan 1, 2003 5 SG Bob, please note as I mentioned the master server is W2K OS and not Unix. The file you are refering is for Unix. Upvote 0 Downvote
Bob, please note as I mentioned the master server is W2K OS and not Unix. The file you are refering is for Unix.
Jan 6, 2003 #4 jjjon Technical User Jul 31, 2002 165 IE Not sure about W2K, but we have an NT4 Master Server, and this works. Upvote 0 Downvote
Jan 6, 2003 #5 jjjon Technical User Jul 31, 2002 165 IE We have an NT4 Master Server, and I've created this file to increase the Keep_days to 5 - I'd be pretty sure that it's the same on W2K. Upvote 0 Downvote
We have an NT4 Master Server, and I've created this file to increase the Keep_days to 5 - I'd be pretty sure that it's the same on W2K.
Jan 7, 2003 Thread starter #6 ManojOK MIS Jan 1, 2003 5 SG Thanks Bob, I'll check that out on W2K. Upvote 0 Downvote
Jan 12, 2003 Thread starter #7 ManojOK MIS Jan 1, 2003 5 SG Bob, it took time for me to figure out, as it did not work with jobs.conf rather it is job.conf. Thanks Upvote 0 Downvote
Bob, it took time for me to figure out, as it did not work with jobs.conf rather it is job.conf. Thanks