Hi all
I need urgent help with a date format issue.
I have a report in Cognos 8.4 that exports data to Excel 2002. The date fields are not always exported in the date format (dd/mm/yy hh:mm:ss) but sometimes is a number.
Example:
13.07.2010 18:00
40372.72916666
To me it seems it happends...
Hi all
I have an issue with a chart in Cognos 8.4 comparing to 8.2 version.
I have a bar graph, horizontal (actual a combination graph)and on axis x I show the values for count of tickets, and it is showing the intervals as:
0 0 0 1 1 1 (version 8.4)
0 0.2 0.4 0.6 0.8 1 (version...
Hi all
I have 2 tables
table1:
cr_id
1
2
3
and
table2:
cr_id, location
1 loc1
1 loc2
2 loc3
3 loc3
3 loc4
I need to show in the excel output the list of cr_ids and associated locations separated by comma for example. Like below
1 loc1, loc2
2 loc3
3 loc3...
Thank you all.
In the meantime we also tried and replaced with 'and' and now it works.
We assume that the & is interpreted in a way by the passing through process or Oracle (which interpretes it as asking for another parameter).
hou&se was just a quick example :)...actually we have department...
Hi all
I have a cube and drill-through report.
One of the dimensions of the cube has the values:
'tree'
'hou&se'
'block'.
I have for example three dimensions in the cube:
dim1 (the one above)
dim2 (date)
dim3.
If I select dim1='tree' and a value for dim2 and dim3, the drill-through works...
Hi all
Do you know how can I rotate the labels in the Ordinal Axis in a graph, from showing them horizontal direction into vertical direction (90degrees)?
I am using Cognos Report Studio 8.2
Thanks
Miki
I am also quite new to Cognos...but I would say: create normal/basic prompts prompt1, prompt2, prompt3, with the labels above, ask for user input...and then inside the report: apply filters to your calculations 'Days in Inventory Avail'>prompt1 (20), etc.
Cheers
Miki
If I create a new simple crosstab report, which goes over more pages, it shows only one time the headers of the rows/columns. So I dont know what you did...maybe you grouped them...or updated some properties.
Have you tried to create a completely new simple crosstab?
Cheers
miki
Hi all
I have a Cognos 7 cube with a drill-through report Cognos 8.2
I have for example 2 dimensions on which I can drill-through:
Metadata items
- [REQUESTOR_BUSS_FUNCTION] (with values Blank and 'Architecture')
- [CREATED_DATE] with dates
1. If I choose 'Architecture' and dates for which...
Hi drlex,
Unfortunately I tried with NULL values already and it doesnt work.
If I add this condition, it takes from the table2 the records with group_id is empty (which exist) and it still doesnt take any day from table1 which has no record in table2 (in my example above: table1.day4).
Thanks...
Hi all
I have in an FM model, table1 & table2 with a left outer join.
1table: every day in the calendar:
day1, day2, day3, day4.
2table: day, record_id, group_id:
day1, record_id1, gr_id1
day1, record_id2, gr_id2
day2, record_id3, gr_id1
day3, record_id4, gr_id2
I want to be able in Cognos...
Hi all
Is there any function (or way to do it) that would return the previous record values while I am reading the current record?
I need to do a calculation = previousrecord.field1 - currentrecord.field1?
any ibm support/tips&tricks document existing to give me some ideas on this?
Thanks...
Hi all
I have a report that extracts the reported_date field from a database, where the date is stored in GMT time.
Currently in the report this reported_date is shown in GMT time (like in the database).
I would like to know if there is a function in Report Studio that converts this date into...
Hi all
Thanks for the answers.
So far I managed to show them in the footer of the report (because the values I want to show are percentiles on a group) and then export them (with option: maintaining position of the values) to Excel and run another report based on this intermediary excel file...
Hi
I have the following data:
weekno field1 field2 field3
week1 value1 value2 value3
week2 value4 value5 value6
I would like to show the data trasponzed (as you are able to do in Excel by clicking on copy-paste special and transpose:
weekno week1 week2
field1 value1 value4
field2 value2...