WO created from MST with two different Equipment Numbers

Status
Not open for further replies.

dpes1

MIS
Apr 21, 1999
53
US
Ellipse Version 5.2.3.4

Problem:
The same WO# has a record in MSF740 with different Equip No# attached. In first example, the MSO620 shows the WO assigned to LV086. But there is a record in both work group 1641 (DT023) and 1611 (LV086)for the task for the equipment number shown.

See example:
WG WG Date Run # WO Equip Std Job
1641 20040209 E 006473 00195528 DT023 TRUCKC
1611 20040209 E 006472 00195528 LV086 PMSERA

1641 20040209 E 006473 00195534 FB033 TRUCKB
1611 20040209 E 006472 00195534 LV115 PMSERA

1611 20040209 E 006472 00195535 LV118 PMSERD
1641 20040209 E 006473 00195535 FB035 TRUCKA

1611 20040209 E 006472 00195543 PU062 PMSERA
1641 20040209 E 006473 00195543 TL030 TLMONT

1641 20040209 E 006473 00195575 FB020 TRUCKA
1611 20040209 E 006472 00195575 LV105 PMSERA

1611 20040209 E 006472 00195577 LV133 PMSERB
1641 20040209 E 006473 00195577 FB105 TRUCKB

1641 20040209 E 006473 00195578 FB109 TRUCKA
1611 20040209 E 006472 00195578 LV138 PMSERC

1641 20040209 E 006473 00195584 TL048 TLMONT
1611 20040209 E 006472 00195584 PU075 PMSERA

1611 20040209 E 006472 00196314 PU093 PMSERD
1641 20040209 E 006473 00196314 TR007 TRUCKA

1641 20040209 E 006472 00196344 LV091 PMSERD
1641 20040209 E 006473 00196344 EX006 TRUCKA

1641 20040209 E 006472 00196346 LV109 PMSERD
1641 20040209 E 006473 00196346 FB023 TRUCKB

Has this happened to anyone else? These are all 9000 series tasks.

Rgds
Donna
 
Donna,

I have seen this problem a couple of times. Here is what I tracked down as the probelms:

1) Users changed the equipemnt number on the work order through MSQ620

2) Same work order numbers from different districts.

Did this happen in version 4.1 or is this new since 5.2.3?

 
Hi Donna,

If I understand the question correctly then this is not a problem it is standard functionality.

MIMS (ELLIPSE) programs tasks, it does not program work orders as such. Therefore it could be that the Standard Job that you are using as the work order template for this task is one that contains a task in a different work group.

MIMS referes to these tasks as "foreign". Therefore when you run the MSB740 program it commits this task within the relevent scheduling period of the "foreign" workgroup.

This is an extremely useful function for allowing work to be programmed by the 9000 series, therefore including the supression function, within two (or more) different workgroups.

Have a look at the following to verify this:

In MSQ740 is there a task number for the work order within the period that has been commited? If not then this is the work order header only and if the task is not present it will could be that it has been created with another work group assigned to it.

OR... are there two different tasks for the same work order? (With diferent work groups)

If I have read the question incorrectly please let me know as there are a number of other potential causes for this situation in my experience.

Cheers

Oz...
 
Oz,

Have another look at the data: the same work order appears for two separate items of equipment as well. As you are aware, regardless of the number of tasks and work groups, there can only be ONE item of equipment attached to the work order.
 
Fair statement, I didnt actually note that the first time I looked. Thanks..

Oz...
 