Hi,
I have a Windows XP Professional with Microstrategy 7.2.3.
When I try to run a report of any Project in 2 tier o 3 tier, appear a error message "Insufficient Memory".
Tha min size of a Virtual Memory is 1024 MB and a max size is 4094.
I re-install Microstrategy 2 times.
Any idea of this problem?
Thanks
I have a Windows XP Professional with Microstrategy 7.2.3.
When I try to run a report of any Project in 2 tier o 3 tier, appear a error message "Insufficient Memory".
Tha min size of a Virtual Memory is 1024 MB and a max size is 4094.
I re-install Microstrategy 2 times.
Any idea of this problem?
Thanks