In CR11, I am using a subreport to create a cumulative totals section.
In the Main report, the user selects a week within the project period and then it populates the totals for that specific week.
MAIN RPT
Week Ending 1/14/07
WORK SICK TOTAL
BSmith 32 2 34
RKelly 44 0 44
WTomas 10 8 18
I need the subreport to then calculate the totals, for all of the weeks within the project period, prior to the given week the user selects. I presume the easiest wasy to do this is with a variable? I do not need to show this detailed info, I just need it to get the totals together.
Project to Date
WORK SICK TOTAL
BSmith 220 16 236
RKelly 200 40 240
WTomas 178 9 187
Any idea the best way to go about this?
In the Main report, the user selects a week within the project period and then it populates the totals for that specific week.
MAIN RPT
Week Ending 1/14/07
WORK SICK TOTAL
BSmith 32 2 34
RKelly 44 0 44
WTomas 10 8 18
I need the subreport to then calculate the totals, for all of the weeks within the project period, prior to the given week the user selects. I presume the easiest wasy to do this is with a variable? I do not need to show this detailed info, I just need it to get the totals together.
Project to Date
WORK SICK TOTAL
BSmith 220 16 236
RKelly 200 40 240
WTomas 178 9 187
Any idea the best way to go about this?