I encountered the following error when trying to run the report in PeopleSoft's Process Scheduler:
"Unable to connect: incorrect log on parameters. %6 %7 %8 %9 (65,30)"
It works fine when I previewed my report in Crystal Reports 9. I think it has something to do with the subreport that i added, since it works fine with out it. The parameter used for the subreport is among the parameters used for the main report. Is there something I forgot to add?
Has anybody encountered this error message before?
Any advice would be welcome. Thanks.
"Unable to connect: incorrect log on parameters. %6 %7 %8 %9 (65,30)"
It works fine when I previewed my report in Crystal Reports 9. I think it has something to do with the subreport that i added, since it works fine with out it. The parameter used for the subreport is among the parameters used for the main report. Is there something I forgot to add?
Has anybody encountered this error message before?
Any advice would be welcome. Thanks.