Hi Guys,
I have a critical site in an airport with 12 LIMs-TSW.
6 LIMs are connected to the group switch in the same room.
The other LIMs are remote. the remote LIMs are connected to the group switch through the BIM transmission module.
the customer wants to replace the BIM by a new multiplexer equipment, so we have to connect the remote LIMs to the new equiment.
Please let's share the experience and let me know if there is any thing should I do from the TSW side before or during the hand over.
I have in the site a duplaicated group switch.
Should I remove the duplicated group switch first?? should I restart some program units during the hand over to the nwe transmission equipment??
Your cooperation is really appreciated.
Best Regards
I have a critical site in an airport with 12 LIMs-TSW.
6 LIMs are connected to the group switch in the same room.
The other LIMs are remote. the remote LIMs are connected to the group switch through the BIM transmission module.
the customer wants to replace the BIM by a new multiplexer equipment, so we have to connect the remote LIMs to the new equiment.
Please let's share the experience and let me know if there is any thing should I do from the TSW side before or during the hand over.
I have in the site a duplaicated group switch.
Should I remove the duplicated group switch first?? should I restart some program units during the hand over to the nwe transmission equipment??
Your cooperation is really appreciated.
Best Regards