Hi All,
I am trying to convert my tnb to Excel using the mv.xls utility. I am doing this on a vista machine with Excel 2007. I am getting a run time 75 error when I try to load the tnb capture file into it....
It worked fine until I "upgraded" to Vista.
Any ideas??
Thanks,
Brian
I am trying to convert my tnb to Excel using the mv.xls utility. I am doing this on a vista machine with Excel 2007. I am getting a run time 75 error when I try to load the tnb capture file into it....
It worked fine until I "upgraded" to Vista.
Any ideas??
Thanks,
Brian