Yes you read that correctly - 30 thousand phones.
I am a contractor at a client site and may need to install 30,000 Avaya phones. I wanted to get a few ideas on how long this would take, this time frame would need to include programming the station (assuming a dup sta), unwrapping the phone, placing the phone, establishing a connection and assigning a number and removing old phone and tossing it into a tub/dumpster.
This is spread over 40 sites ranging in size from 6 seats to over 6200 seats. I am putting together a project plan and need to at least throw out a few figures for date frames. How many people would it take to install and spot test 6,200 phones in a weekend? I could stage phones all week but the placement would likely need to be done on a weekend.
Do you by chance know how many 9620s fit on a pallet?
I am a contractor at a client site and may need to install 30,000 Avaya phones. I wanted to get a few ideas on how long this would take, this time frame would need to include programming the station (assuming a dup sta), unwrapping the phone, placing the phone, establishing a connection and assigning a number and removing old phone and tossing it into a tub/dumpster.
This is spread over 40 sites ranging in size from 6 seats to over 6200 seats. I am putting together a project plan and need to at least throw out a few figures for date frames. How many people would it take to install and spot test 6,200 phones in a weekend? I could stage phones all week but the placement would likely need to be done on a weekend.
Do you by chance know how many 9620s fit on a pallet?