Before SP4 we were running two backup jobs per day.
The first backup job uses the GFS 5 day full rotation job will automatic Tape Labeling and runs around midday.
The second job would run in the evening and would be on a custom schedule and data would be appended to the tape.
We did this so that all the daily backups would have a GFS tape name and during the day, when the GFS job ran, if the incorrect tape was not in the drive (not from the pool) it would fail and we would be notified.
A Glorious Tape Check Job
Problem we have now,using SP4 the second nightly job will not append to the tape and request a blank tape and then fails. I have come to the conclusion that you cannot append data onto a GFS tape.
Does anyone know how to get around this, or know of another method to run the above daily Tape Check.
Thanks in Advance
Justs
The first backup job uses the GFS 5 day full rotation job will automatic Tape Labeling and runs around midday.
The second job would run in the evening and would be on a custom schedule and data would be appended to the tape.
We did this so that all the daily backups would have a GFS tape name and during the day, when the GFS job ran, if the incorrect tape was not in the drive (not from the pool) it would fail and we would be notified.
A Glorious Tape Check Job
Problem we have now,using SP4 the second nightly job will not append to the tape and request a blank tape and then fails. I have come to the conclusion that you cannot append data onto a GFS tape.
Does anyone know how to get around this, or know of another method to run the above daily Tape Check.
Thanks in Advance
Justs