r11.5 SP2 (Build 4232)
We run our tapes on a 4 week schedule. IE exchange_users-mon-set1 exchange_users_tue-set1..exchange_users-mon-set2 etc etc. changing the tape manually each day and sending them offsite until needed.
We run 4 daily jobs from scripts as follows
start time job explenation
5:00pm daily servers 5 servers straight to tape
5:00pm Mailboxes brick level MB's staging then to tape
5:00pm endusers enduser backups staging then to tape
2:30am exchange exchange server staging then to tape
Daily servers completes around 2-2:30am thus freeing up the tape drive to copy the mailboxes and endusers over while exchange is staging. then exchange copies to tape when finished All in all 4 jobs complete by 6am (which is needed)
all 3 stage jobs copy to the same tape.
Now to my problem.
The daily servers job (straight to tape) is Cataloging fine into the database and I'm able to do restores without a problem as soon as the job finishes it catalogs it
[CAT ] DAILY_SERVERS-WED-SET3 [ID:9F3E,SESSION:1] is merged.
But the only time time I get the cataloging occuring with the staged jobs is when the staging is complete ie
[CAT ] EXCHANGE-STAGE-DISC [ID:BDD8,SESSION:1] is merged.
But this never occurs when all jobs have copied to tape. Since cataloging the stage disk is no use to me as I purge that data right after the tape copy I want the TAPE AS A WHOLE with all three jobs (exchange mailboxes and endusers) to be cataloged. How do I go about getting this done?
Right now when I go to restore by session its showing old Data and not the newiest. I have to delete old records then merge the tape in for me to see the most current.
Sorry for this being so long I wanted to give as much data as possible. and thanks in advance for the help.
Mike H
p.s. I got crowned the "backup guy" when I took this job even tho I've never once had to do this, and it seems no one in this place has any clue on how to help me!!!
We run our tapes on a 4 week schedule. IE exchange_users-mon-set1 exchange_users_tue-set1..exchange_users-mon-set2 etc etc. changing the tape manually each day and sending them offsite until needed.
We run 4 daily jobs from scripts as follows
start time job explenation
5:00pm daily servers 5 servers straight to tape
5:00pm Mailboxes brick level MB's staging then to tape
5:00pm endusers enduser backups staging then to tape
2:30am exchange exchange server staging then to tape
Daily servers completes around 2-2:30am thus freeing up the tape drive to copy the mailboxes and endusers over while exchange is staging. then exchange copies to tape when finished All in all 4 jobs complete by 6am (which is needed)
all 3 stage jobs copy to the same tape.
Now to my problem.
The daily servers job (straight to tape) is Cataloging fine into the database and I'm able to do restores without a problem as soon as the job finishes it catalogs it
[CAT ] DAILY_SERVERS-WED-SET3 [ID:9F3E,SESSION:1] is merged.
But the only time time I get the cataloging occuring with the staged jobs is when the staging is complete ie
[CAT ] EXCHANGE-STAGE-DISC [ID:BDD8,SESSION:1] is merged.
But this never occurs when all jobs have copied to tape. Since cataloging the stage disk is no use to me as I purge that data right after the tape copy I want the TAPE AS A WHOLE with all three jobs (exchange mailboxes and endusers) to be cataloged. How do I go about getting this done?
Right now when I go to restore by session its showing old Data and not the newiest. I have to delete old records then merge the tape in for me to see the most current.
Sorry for this being so long I wanted to give as much data as possible. and thanks in advance for the help.
Mike H
p.s. I got crowned the "backup guy" when I took this job even tho I've never once had to do this, and it seems no one in this place has any clue on how to help me!!!