Hi
I need some help regarding singlemode fibre. if the backbone cabling from outside plant is entering the facility the first patch panel it entered should have single mode patch cords on other end or what are the other possibilities.the next node shall be a switch. technically how short and how long SM patch cords can be used? can u give different solution in stepby step form.
Hi
I need some help regarding singlemode fibre. if the backbone cabling from outside plant is entering the facility the first patch panel it entered should have single mode patch cords on other end or what are the other possibilities.the next node shall be a switch. technically how short and how long SM patch cords can be used? can u give different solution in stepby step form.