I have BE 9.1 for Netware on Netware6 and when I setup a job to repeat I only have the options to run it once, repeat every day, repeat weekly or repeat monthly. I dont want it to run on saturday or sunday, so is there a way to select the days that I want it to run like on BE for windows?