We put 2 clients using savepnpc command in one group, but the commands are run on both machines at the same time (with consequence that both DB's are stopped).
Can we schedule the group, so that the Precmd on the 2nd client is run only AFTER the end of the backup and the Pstcmd of the second machine ? ("serializing" of the machines).
I cannot be sure that the backup of the 1st one ends at a known time. Split up in 2 groups is thus not a solution.
client: NW 6.1.4 on Windows NT 4
NW server: 7.1.1 on Solaris 9
Thanks in advance
E. Tahon
Can we schedule the group, so that the Precmd on the 2nd client is run only AFTER the end of the backup and the Pstcmd of the second machine ? ("serializing" of the machines).
I cannot be sure that the backup of the 1st one ends at a known time. Split up in 2 groups is thus not a solution.
client: NW 6.1.4 on Windows NT 4
NW server: 7.1.1 on Solaris 9
Thanks in advance
E. Tahon