Hi Guys!
I need to change the location of the rectifier that powers the MD110 BC9. How do I safely shutdown the PBX and then turn on?
I will need to replace the cables that connect the rectifier to the CLM magazine.
I have 5 LIM, 1 GSM and 5 CLM modules.
Would the procedures be similar to thread806-639225?
1. Turn off HDU
2. Turn off all PU4DC/PU5DC
3. Turn off all CLM
4. Turn off batteries
5. Turn off rectifier
Best regards.
I need to change the location of the rectifier that powers the MD110 BC9. How do I safely shutdown the PBX and then turn on?
I will need to replace the cables that connect the rectifier to the CLM magazine.
I have 5 LIM, 1 GSM and 5 CLM modules.
Would the procedures be similar to thread806-639225?
1. Turn off HDU
2. Turn off all PU4DC/PU5DC
3. Turn off all CLM
4. Turn off batteries
5. Turn off rectifier
Best regards.