I'm using Arcserve 6.5 for NT - Enterprise Edition.
Am I right that this product doesn't easily cater for jobs that run once per month using a media pool?
Is there some neat manual way of setting this up? Do later versions of Arcserve cater for this?
Thanks in advance
Am I right that this product doesn't easily cater for jobs that run once per month using a media pool?
Is there some neat manual way of setting this up? Do later versions of Arcserve cater for this?
Thanks in advance