telemorgan
MIS
I have a policy (Mon_Exp) that runs once a week on Monday nights. This policy writes to one volume pool (Mon_Exp_pool) which has one tape in it (A00001). I have the same setup for each day of the week, where one policy writes to one volume pool that has one tape in it. Tues_Exp policy writes to Tues_Exp_pool which has A00002. So what I am trying to do is have Mon_Exp and the other policies written to the same tape each week. I would like to keep two weeks worth of these images on a tape and then have them expire and overwritten on the third week. What settings (retention level, frequency, etc.) will need to be set in order to do this.
Thanks
-Travis
Thanks
-Travis