I was wondering if there is a documented procedure on Powering down the CS1000s and powering it up. I have heard that on pwr up that you should start with the Callserver and wait for it to fully come up before powering up the other MG's.
Is there an official nortel documented procedure??
Thanks in advance
Is there an official nortel documented procedure??
Thanks in advance