My building just informed me that they are ready to test a new generator that was installed. I would like to power down my Electra Elite system before this happens and swith it over to our own UPS. Can anyone tell me the proper procedure for powering the system down and then back up. Also am I in danger of losing any programming or messages while the system is down? If not how long will the programming keep while system is powered down? Thanks in advance.