Hi, it is CS1000E, HA with 04 MGC`s. I was loading MGC loadware into all MGC`s through Element Manager. After starting mgc loadware (I selected all new loadware and presses load and activate) the signalling server accidently power gots off after 20 or 30 minutes.I restarted signalling server, Now when i check /u/loadware directory through PDT it shows all new patches and when i run LWSTAT command it shows 02 patches loaded and installed but other 05 patches showing loaded but not installed. When i run LWINST it pops an error "PSDL is in process try later". I also ran UPGMG ALL SEQ FORCE but after completing this command it still shows 02 new loadware and 05 old loadware. PSDL process is still running when i ran LWINST again. I also waited for 30 or 40 minutes but no success.I also shutdown complete system with no success and PSDL process is still running when i ran LWINST. When i ran LWLOAD it says patch is already loaded. Can somebody help me out how do i stop PSDL process and installed remaining 05 new loadwares.