I need to have different actions activated for the same message record depending on what time or day of the week it is. Is there a way to do this?????
i.e. If a node goes down and it is Sunday, I want to send a page to the 24 hr engineer, but if the same node goes down on Monday at noon, I want an email sent to the team.
I tried to do this creating two message records the same and then based on the calendar it would perform the action. But it seemed to only use one or the other message records.
i.e. If a node goes down and it is Sunday, I want to send a page to the 24 hr engineer, but if the same node goes down on Monday at noon, I want an email sent to the team.
I tried to do this creating two message records the same and then based on the calendar it would perform the action. But it seemed to only use one or the other message records.