Hi all.
I'm planning to upgrade 5 X IBM P51A machines from AIX V5.2 to 5.3 in the next few weeks. Though the AIX upgrade itself should be simple enough (smit installp, install latest available software), I suppose I need to ensure that my firmware on these machines is up to the required levels.
Where can I find info relevant to my upgrade or is there anyone here that can advise on best practises for this type of 'project'?
My environment consists of the following: DS4300 storage unit, 2 SAN switches (IBM 2005-16B) and then my P51A's.
Not sure if more info is required to advise, but please let me now. Hoping that someone will be able to point me in the right direction.
Thanks
kat000003
I'm planning to upgrade 5 X IBM P51A machines from AIX V5.2 to 5.3 in the next few weeks. Though the AIX upgrade itself should be simple enough (smit installp, install latest available software), I suppose I need to ensure that my firmware on these machines is up to the required levels.
Where can I find info relevant to my upgrade or is there anyone here that can advise on best practises for this type of 'project'?
My environment consists of the following: DS4300 storage unit, 2 SAN switches (IBM 2005-16B) and then my P51A's.
Not sure if more info is required to advise, but please let me now. Hoping that someone will be able to point me in the right direction.
Thanks
kat000003