Hello forum,
we have an L80 library used for backup; only one drive at a time is used; when it finishes it uses the other drive, i want to use all 6 drives together. it was working fine; but after we changed a drive on the library and another one had a bad cable we faced this problem.
Anybody can help?
we have an L80 library used for backup; only one drive at a time is used; when it finishes it uses the other drive, i want to use all 6 drives together. it was working fine; but after we changed a drive on the library and another one had a bad cable we faced this problem.
Anybody can help?