franksoprano
Technical User
At our shop we quite frequently re-load our systems with different versions of AIX.. Sometimes its not always installed via NIM MASTER, but rather CD or TAPE Backup..
Is there anyway to make the NIM process easier then having to sit and wait for the RS6000 Logo screen to flash before hitting the interrupt key 8??? I know I cant control the system from the master since it was loaded by the master, or it may not be up or configured with a IP of the same network...
Any tips/tricks to make it almost completely fully automated?? I have set up my bosinst files, just waiting for some of the servers to get to the LOGO screen is a beast..
Thanks!!
Is there anyway to make the NIM process easier then having to sit and wait for the RS6000 Logo screen to flash before hitting the interrupt key 8??? I know I cant control the system from the master since it was loaded by the master, or it may not be up or configured with a IP of the same network...
Any tips/tricks to make it almost completely fully automated?? I have set up my bosinst files, just waiting for some of the servers to get to the LOGO screen is a beast..
Thanks!!