I am new to Microsoft Projects and got this product for a single project. I have MSP 2007 and do not know where to begin. I should buy a book but I was hoping someone could just point me in the right direction or show me a template close to what I want so I can reverse engineer it. I am good at entering data in excel but I would like them to do the same data in MSP and have the bars on the side to represent the data.
Attached is a single line in my MSP with all the information I’m trying to cram into it and it should give you a good idea on what I’m trying to achieve. I inputted all the data manually but would like it so all I have to do in input the SIGN ON time and the Lv. Gar. and Begin Rev would auto fill in and I enter End Rev. and Arr. Gar. and Sign Off would auto fill in. But MSP formula is different then Excel. I only need the Gantt chart bars to show the sign on and sign off time. All the other data is extra information. (Example of formula needed Sign on at 5:22 then Lv. Gar. is 5:32, I need a MSP formula to add 10 min to it.)
Bonus: Is it is possible to make each time points show on the Gantt chart with a different color bar that would be helpful but not required. (Example, Sign on to Lv. Gar. is pink: then: Lv. Gar. to Begin Rev. is blue. and so on and so on.) Also to calculate the Pay Hours from the Sign Off to the Sign Off.
Any help is appreciated; even a simple not possible in MSP will help me decide if I need a new method of achieving my goals.
Thank You,
Attached is a single line in my MSP with all the information I’m trying to cram into it and it should give you a good idea on what I’m trying to achieve. I inputted all the data manually but would like it so all I have to do in input the SIGN ON time and the Lv. Gar. and Begin Rev would auto fill in and I enter End Rev. and Arr. Gar. and Sign Off would auto fill in. But MSP formula is different then Excel. I only need the Gantt chart bars to show the sign on and sign off time. All the other data is extra information. (Example of formula needed Sign on at 5:22 then Lv. Gar. is 5:32, I need a MSP formula to add 10 min to it.)
Bonus: Is it is possible to make each time points show on the Gantt chart with a different color bar that would be helpful but not required. (Example, Sign on to Lv. Gar. is pink: then: Lv. Gar. to Begin Rev. is blue. and so on and so on.) Also to calculate the Pay Hours from the Sign Off to the Sign Off.
Any help is appreciated; even a simple not possible in MSP will help me decide if I need a new method of achieving my goals.
Thank You,