I am scheduled for school, but really need to get a system installed prior. We have another system, which I took screen shots of the programming/configuration. What I need to know is the required order of programming, particularly involving setting up a 2 PRI trunk group. I am assuming there is also the Dchannel(s) to set up as well. Can someone tell me the steps within IMAT to get those PRIs up and running? Is there a programming worksheet out there? I am well versed in PRI and the Nortel world.
Thanks in advance!
Thanks in advance!