I have to program a new PRI T1, the customer wants more trunks in an exsisting route.
I am looking for brief details, something to let me know in specific order which loads to go into and the function of each load. Something such as:
1.) Load xx to program the loop
2.) Load xx to program the d-chan
3.) Load xx to add the PRI to exsisting route
4.) Load xx to program the trunks
Which loads do I go in by order and what function is set up in each load.
I am looking for brief details, something to let me know in specific order which loads to go into and the function of each load. Something such as:
1.) Load xx to program the loop
2.) Load xx to program the d-chan
3.) Load xx to add the PRI to exsisting route
4.) Load xx to program the trunks
Which loads do I go in by order and what function is set up in each load.